Local Issues
Longmont Resilient St. Vrain project
Longmont is advancing the Resilient St. Vrain flood-risk reduction project in multiple reaches. At Hover Reach, design is continuing after FEMA approval of the 30% plans, with construction tentatively scheduled to begin in 2028.